A Secret Weapon For harga tiang listrik besi 6 meter
Blow-out failure: failure is characterised with the lateral spalling of concrete inside the proximity in the anchor's head. This kind of failure happens for anchors (prevalently cast-in-position) put in in close proximity to the edge of the concrete aspect.In an ACB, the arc is interrupted by directing a large-velocity blast of compressed air onto